ArcGIS REST Services Directory Login
JSON

Layer: sLateral (ID: 43)

View In:   ArcGIS Online Map Viewer

Name: sLateral

Display Field: STREETNAME

Type: Feature Layer

Geometry Type: esriGeometryPolyline

Description: 182.0175(2m)(2m)  Transmission facilities owner requirements.(a) Responsibilities. A transmission facilities owner shall do all of the following:1. Respond to a planning notice within 10 days after receipt of the notice by conducting field markings, providing records and taking other appropriate responses.2. Respond to an excavation notice within 3 working days by marking the location of transmission facilities and, if applicable, laterals as provided under par. (b) in the area described in the excavation notice.3. Provide emergency locater service within 24 hours after receiving a request for that service.(b) Facilities marking. A person owning transmission facilities, upon receipt of an excavation notice, shall mark in a reasonable manner the locations of transmission facilities at the area described in the notice to enable the excavator to locate the transmission facilities without endangering the security of the facilities or the public. For purposes of this paragraph, transmission facilities are marked in a reasonable manner if the owner of the transmission facilities locates and marks the transmission facilities to a level of accuracy and precision consistent with national standards. Except as provided in par. (bm), if the person is a local governmental unit and if the excavation notice relates to sewer or water facilities owned by the local governmental unit, the local governmental unit shall also mark the locations within the public right-of-way of all laterals connected to the sewer or water facilities at the area described in the notice. The marking of facilities shall be completed within 3 working days after receipt of the notice, or if notice is given more than 10 days before excavation is scheduled to begin, marking shall be completed at least 3 working days before excavation is scheduled to begin. If the approximate location of a transmission facility is marked with paint, flags, stakes or other physical means, the following color coding of lines, cables or conduits shall comply with the uniform color code adopted by the American National Standards Institute:1. Electric power: red.2. Gas, oil, steam, petroleum or gaseous materials: yellow.3. Communications, cable television or alarm or signal systems: orange.4. Water, irrigation or slurry systems: blue.5. Sewer or drain systems: green.6. Temporary survey markings: pink.7. Proposed excavation: white.(bm) Local governmental units. A local governmental unit is considered to have satisfied the requirement under par. (b) to mark the locations within the public right-of-way of all laterals connected to sewer or water facilities if the local governmental unit makes available to an excavator, for inspection and making copies, information on the location of such laterals as shown on maps, drawings, diagrams, or other records, that are readily available. If a local governmental unit has no such readily available information regarding such laterals and the local governmental unit provides the excavator with a written notice that the local governmental unit has no such readily available information, the local governmental unit is considered to have satisfied the requirement under par. (b) to mark the locations within the public right-of-way of all laterals connected to the sewer or water facilities.(br) Private transmission facilities. Paragraphs (a) to (bm) do not apply to owners of private transmission facilities.(c) Facilities inspection and repair. Every person owning transmission facilities who receives a notice of possible damage shall inspect the facilities for damage within 6 hours after receipt of the notice if there is risk of personal injury or loss of life or within 24 hours after receipt of the notice if there is not a risk of personal injury or loss of life and shall repair any damage found as soon as practicable. Unless the owner of any transmission facility is notified or has knowledge of damage to transmission facilities by an excavator, the owner is not responsible for or required to make an inspection of its transmission facilities, nor shall the owner, in the absence of notification or knowledge, be responsible for supervising in any manner the excavation.(2r)  Facilities installed after December 31, 2006. Any person who, after December 31, 2006, installs a nonconductive water or sewer lateral shall also install a locating wire or other equally effective means for marking the location of the lateral. The requirement shall not apply to minor repairs to, or partial replacements of, laterals installed before January 1, 2007.

Service Item Id: e4f4b723cea9408ab04cbe89e533e4b0

Copyright Text:

Default Visibility: true

MaxRecordCount: 2000

MaxSelectionCount: 0

Supported Query Formats: JSON, geoJSON, PBF

Min Scale: 0.0

Max Scale: 0.0

Supports Advanced Queries: true

Supports Statistics: true

Can Scale Symbols: false

Use Standardized Queries: true

Supports ValidateSQL: true

Supports Calculate: true

Supports Datum Transformation: true

Extent:
Drawing Info: Feature Draw Order: Advanced Query Capabilities:
HasZ: false

HasM: false

Has Attachments: false

HTML Popup Type: esriServerHTMLPopupTypeAsHTMLText

Type ID Field: SUBTYPE

Fields: Types:
Capabilities: Query,Create,Update,Delete,Uploads,Editing,Extract

Sync Can Return Changes: true

Is Data Versioned: true

Supports Rollback On Failure: false

Supports ApplyEdits With Global Ids: false

Edit Fields Info:
Supports Query With Historic Moment: true

Supports Coordinates Quantization: true

Child Resources:

Supported Operations:   Query   Query Analytic   Apply Edits   Add Features   Update Features   Delete Features   Calculate   Append   Validate SQL   Generate Renderer   Return Updates   Iteminfo   Thumbnail   Metadata