ArcGIS REST Services Directory Login
JSON

Layer: Unknown Material (ID: 12)

Name: Unknown Material

Display Field: STREETNAME

Type: Feature Layer

Geometry Type: esriGeometryPoint

Description: Notes:1. May 15, 2003 this data was added to SDE for SQL Server 2000. Prior to that it was in coverage format.2. Added the field PRIVATE to this feature class, wLateral on February 10, 2020. Use this to indcate laterals that are private or lateral drawn past the city owned valve.3. Added the the coded value, 'Stub-No Material,' to the domain name, wDmLateralMaterial, on April 4, 2024. So that we don't have 'unknown' materials showing up in our Dashboards for water.182.0175(2m)(2m)  Transmission facilities owner requirements.(a) Responsibilities. A transmission facilities owner shall do all of the following:1. Respond to a planning notice within 10 days after receipt of the notice by conducting field markings, providing records and taking other appropriate responses.2. Respond to an excavation notice within 3 working days by marking the location of transmission facilities and, if applicable, laterals as provided under par. (b) in the area described in the excavation notice.3. Provide emergency locater service within 24 hours after receiving a request for that service.(b) Facilities marking. A person owning transmission facilities, upon receipt of an excavation notice, shall mark in a reasonable manner the locations of transmission facilities at the area described in the notice to enable the excavator to locate the transmission facilities without endangering the security of the facilities or the public. For purposes of this paragraph, transmission facilities are marked in a reasonable manner if the owner of the transmission facilities locates and marks the transmission facilities to a level of accuracy and precision consistent with national standards. Except as provided in par. (bm), if the person is a local governmental unit and if the excavation notice relates to sewer or water facilities owned by the local governmental unit, the local governmental unit shall also mark the locations within the public right-of-way of all laterals connected to the sewer or water facilities at the area described in the notice. The marking of facilities shall be completed within 3 working days after receipt of the notice, or if notice is given more than 10 days before excavation is scheduled to begin, marking shall be completed at least 3 working days before excavation is scheduled to begin. If the approximate location of a transmission facility is marked with paint, flags, stakes or other physical means, the following color coding of lines, cables or conduits shall comply with the uniform color code adopted by the American National Standards Institute:1. Electric power: red.2. Gas, oil, steam, petroleum or gaseous materials: yellow.3. Communications, cable television or alarm or signal systems: orange.4. Water, irrigation or slurry systems: blue.5. Sewer or drain systems: green.6. Temporary survey markings: pink.7. Proposed excavation: white.(bm) Local governmental units. A local governmental unit is considered to have satisfied the requirement under par. (b) to mark the locations within the public right-of-way of all laterals connected to sewer or water facilities if the local governmental unit makes available to an excavator, for inspection and making copies, information on the location of such laterals as shown on maps, drawings, diagrams, or other records, that are readily available. If a local governmental unit has no such readily available information regarding such laterals and the local governmental unit provides the excavator with a written notice that the local governmental unit has no such readily available information, the local governmental unit is considered to have satisfied the requirement under par. (b) to mark the locations within the public right-of-way of all laterals connected to the sewer or water facilities.(br) Private transmission facilities. Paragraphs (a) to (bm) do not apply to owners of private transmission facilities.(c) Facilities inspection and repair. Every person owning transmission facilities who receives a notice of possible damage shall inspect the facilities for damage within 6 hours after receipt of the notice if there is risk of personal injury or loss of life or within 24 hours after receipt of the notice if there is not a risk of personal injury or loss of life and shall repair any damage found as soon as practicable. Unless the owner of any transmission facility is notified or has knowledge of damage to transmission facilities by an excavator, the owner is not responsible for or required to make an inspection of its transmission facilities, nor shall the owner, in the absence of notification or knowledge, be responsible for supervising in any manner the excavation.(2r)  Facilities installed after December 31, 2006. Any person who, after December 31, 2006, installs a nonconductive water or sewer lateral shall also install a locating wire or other equally effective means for marking the location of the lateral. The requirement shall not apply to minor repairs to, or partial replacements of, laterals installed before January 1, 2007.

Service Item Id: 4b5feb550b3e4ed09fdcbb02931d8101

Copyright Text: City of Wausau 407 Grant St Wausau, WI 54403 (715) 261-6740 www.wausauwi.gov +++++++++ Wausau Water Works Meter Department 1801 Burek Ave Wausau, WI 54401 (715) 261-7265

Default Visibility: true

MaxRecordCount: 2000

Supported Query Formats: JSON, geoJSON, PBF

Min Scale: 5100.0

Max Scale: 0.0

Supports Advanced Queries: true

Supports Statistics: true

Has Labels: false

Can Modify Layer: true

Can Scale Symbols: false

Use Standardized Queries: true

Supports Datum Transformation: true

Extent:
Drawing Info: Advanced Query Capabilities:
HasZ: false

HasM: false

Has Attachments: false

HTML Popup Type: esriServerHTMLPopupTypeAsHTMLText

Type ID Field: SubType

Fields: Types:
Supported Operations:   Query   Query Attachments   Query Analytic   Generate Renderer   Return Updates

  Iteminfo   Thumbnail   Metadata